•Copy.)
Enclosure III,
Report by the Surveyor General.
My report on this project was sent some days ago to The Honorable Colonial Secretary for transmission to His Excellency the Governor General, and it has caused these papers to be circulated without any communication with one another. The Commanding Royal Engineer Major Whitmore and myself appear to have arrived at the same opinion, i.e., that a rough stone breakwater is preferable to sunken janks or a line of piles.
Our Estimates differ somewhat, mine having been based on actual tenders received, but the relative cost of this work cannot be determined until the proposed length of the breakwater is first decided. I would be averse to prolonging the breakwater so far as to make it abut in Green...
•Copy.)
Enclosure III,
Feport by the Surveyor keniral.
My report
on this project
wa
205
sent some days ago
to The Hemerable
folmive Secretary for teamsmission. to stickerllency the Mayor Teneral, and it and have cursed these papers. without any communication with one another. The Commanding Reydi Engineer Major Whitmore and myself appear to have arrived at the same opinion, i.f, that a rough stone breakwater is preferable to sunken janks or a lime of piles.
Our Estimates differ somewhat, mine harring been based on actual tenin received, but the reltionate cost of This work can not be determined
until the proposed length of the breakwater is first decided. I wones
be averse
prolonging
the breakwater
Green
so as to make it abut in